Telangana - The Road cum Rail bridge will be closed for a month from 27 for repairs
The collector stated that the rehabilitation of the carriageway, which is around 4.5 km long B.T. (Black Top Road), will cost Rs. 210 lakh and will include specific repair work of geo-glass grids at secondary joints. It is said that the tendering procedure for this has been finished. She said that a milling machine had previously been used to remove the BT surdata-face.
The police and transport department representatives should keep an eye on the traffic diversion orders, she said. Additionally, other routes are to be used by apsrtc buses. The DEO was instructed to notify the district's educational institutions of the bridge's closure so that they may make other arrangements for their school buses. collector Dr. K madhavi latha said that traffic on the Road cum rail bridge will be suspended for a month from 27th to 26th october for repairs to the central carriageway